# Example case

This is a fictional review fixture, not a real prediction record.

Equipment: pump-17
Prediction: fixture-prediction-001
Forecaster revision: fixture-revision-001
Evidence cutoff: 2026-10-01T12:00:00Z
Evaluation window: 2026-10-01T12:00:00Z to 2026-10-08T12:00:00Z
Predicted probability of failure: 0.70
Observation: vibration measurement at 2026-10-02T09:00:00Z
Observed failure: not supplied

Expected review: the vibration observation is after the evidence cutoff;
it was not an input to the original prediction. A probability of 0.70 does
not establish that a failure occurred. Request evidence available at the cutoff
and an observed outcome for the defined evaluation window.